Walcott, IA
Shive-Hattery provided engineering and architectural services for the design of a 4,900 gpm lift station at the city’s wastewater treatment facility. In addition to the triplex lift station, a building was also provided which housed controls for the lift station, as well as an emergency generator for backup power.
<< back