Skip to Content

Golder Ranch Fire District Fire Station #379

Back to projects

This is the first station completed for the new Mountain Vista Fire District. Station No. 620 includes 11 bunk rooms, a fitness room, dayroom, kitchen, decontamination area, turnout gear room, SCBA/hose storage, and two full apparatus bays plus a half bay for an ambulance. The design includes ground concrete floors, masonry construction, a solar hot water system, and solartube skylights. The station is designed and built to have a long life span and to accommodate a future apparatus bay.

The Fire Station received the Notable Design Award – Career Category – Fire Chief’s Station Style Competition.

Stay in Touch for Monthly Shive-Hattery Industry Insights

We're Learning, Growing + Sharing

Stay on top of the latest industry trends as we share how we are staying ahead of them.

Jen Bennett on Leadership, People, and What Success Really Means

Grow Forward: Inside Shive-Hattery’s 2026 Emerging Professionals Swarm

Beyond the Plaque