Skip to Content

Lakehaven Water and Sewer District Headquarters

Located in Federal Way, WA

Back to projects

The Lakehaven Campus was in need of a new headquarters building to centralize office functions while providing a welcoming facility to service the Federal Way community. A new vehicle storage building, two covered vehicle parking structures, covered materials storage, electrical building, vehicle wash building, and a vehicle service shop building were added as well as upgrades to existing buildings to unify the campus and extend their useful life.

The building’s exterior design reflects a dramatic Northwest Style, with the blended use of exterior materials and color variation within a darker color palette. The primary architectural feature is the 16-sided Rotunda; centrally located in the building, extending above the roofline with clerestory windows at all sides allowing daylight into the central lobby space below.

A “halo” of light, suspended from the rotunda in the lobby interior, matches the signature tower clerestory element above. Interior finishes play off the color blue, symbolizing water, with neutral tones as a backdrop and pops of color throughout.

Stay in Touch for Monthly Shive-Hattery Industry Insights

We're Learning, Growing + Sharing

Stay on top of the latest industry trends as we share how we are staying ahead of them.

The Invisible Work Behind Better Traffic Decisions

Infrastructure

The Right People at the Table

Infrastructure

Helix Design Group is now officially Shive-Hattery